BOB Rebuild: New flow, Same Stoke
We’ve been hard at work on Bagful of Boogie (a.k.a. BOB), and the results are ready to ride.
The bottom half of the trail, roughly 4 km, has been fully rebuilt with fresh dirt, playful features, and plenty of new woodwork, well over 200 feet once it’s all tallied up.
And this is just the start. We’ll be tackling reroutes on the upper section of BOB throughout the rest of the season, but don’t worry, the trail will stay open while we build.
The new product is designed to be fun for all abilities. Think of it as the next step up from Salad Fingers, great for progression, but still approachable. You’ll navigate a few steep corners to get there, then drop into a rebuilt section with minimal braking, a smooth 5 percent gradient, and tons of flow.
This isn’t just a trail to ride, it’s a trail to play on. Riders of every level will find something to love: low-consequence jumps for kids to learn on, side hits to keep adults entertained, and a dedicated drop zone at the finish with one-foot and two-foot options plus an easy up-track for sessioning.
A Huge Thanks to Our Trail Crew
None of this would be possible without the incredible hard work of our trail builders. From reshaping lines to crafting every piece of woodwork, they’ve poured their time and passion into making BOB a trail that’s fun, flowy, and rewarding for every rider. Next time you’re out there, take a lap for the crew.
Whether you’re chasing progression, riding with the family, or just out to have fun, BOB’s rebuild delivers. So much fun is packed into this trail, it’s playful, flowy, and built for every rider.

